Installation Guide

l Wheninstallingmodulesinaconfinedspace,forexample,ifinstallingBuilding-integratedphotovoltaic
(BIPV)modules,ventilationmeasuresmaybeneededtoensurethepoweroptimizersarenotbe
exposedtotemperaturesoutsidetheirspecifications.
NOTE
The images contained herein are for illustrative purposes only and may vary depending on product
models.
Step 1: Mounting and Grounding the Power
Optimizers
Foreachofthepoweroptimizers
1
:
1.
Determinethepoweroptimizermountinglocationandusethepoweroptimizer
mountingbracketstoattachthepoweroptimizertothesupportstructure(See
Figure5).Itisrecommendedtomountthepoweroptimizerinalocationprotected
fromdirectsunlight.Forframe-mountedpoweroptimizersfollowtheinstructions
suppliedwiththeoptimizers,orreferto
https://www.solaredge.com/sites/default/files/installing_frame_mounted_power_
optimizers.pdf.
2.
Ifrequired,markthemountingholelocationsanddrillthehole.
CAUTION!
Drilling vibrations may damage the power optimizer and will void the warranty. Use a torque wrench
or an electric drill with adjustable clutch that meets the mounting torque requirements. Do not use
impact drivers for mounting the power optimizer.
Do not drill through the power optimizer or through the mounting holes.
ATTENTION!
Les vibrations résultant du perçage peuvent endommager l’optimiseur de puissance et annulera la
garantie. Utilisez une cdynamométrique ou une perceuse électrique avec embrayage adaptable
compatible avec les moments indiqs. Ne pas utiliser des tournevis à percussion pour fixer
l’optimiseur. Ne pas percer à travers l’optimiseur de puissance ou ses trous de fixation.
3.
AttacheachpoweroptimizertotherackusingM6(1/4'')stainlesssteelbolts,nutsandwashersor
otherappropriatemountinghardware.Applytorqueof9-10N*m/6.5-7lb*ft.
For3NAseriespoweroptimizes,SolarEdgerecommendsmountingthepoweroptimizeronarailwith
thesmoothsidefacingout,sothatthepoweroptimizerbodywillpreventitsrotation.
4.
Usethefollowingmethods
2
togroundthepoweroptimizer:
WARNING!
The metallic enclosure of the power optimizer must be grounded in accordance with the
requirements of the local and national codes.
AVERTISSEMENT!
L'enceinte métallique de l’optimiseur de puissance doit être mise à la terre en accord avec les
régulations locales et nationales.
1
Not applicable to smart modules.
2
These methods have been evaluated by a nationally recognized testing laboratory as part of the optimizer evaluation.
The SolarEdge-supplied grounding lug kit has been evaluated only for use with SolarEdge power optimizers. It is not
intended or listed to be used as a general purpose grounding lug with other electrical equipment.
Chapter 2: Installing the Power Optimisers
-Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.0
17