Installation Guide

o
Ifabidirectionalmeterisconnectedattheconsumptionpoint,thisvalueistheconsumedenergy.
o
Ifthemeterisinstalledattheproductionpoint,thisvalueistheenergyproducedbythesite.
o
Ifthemeterisinstalledatthegridconnectionpoint,thisvalueistheenergyexportedtothegrid.
Meter Status
Meters
Export RS485- Modbus ID #2
Status: OK
Power: 7.60 kW, Energy: 13.68MWh
Export GPIO S0 meter
1000 pulses per kWh
Power: 7.60kW, Energy: 13.68MWh
l Type and function:Displaysthemeterfunctionality(Production,Export,Import,Export+Import)
l Status:DisplaysOKifthemeteriscommunicatingwiththeinverter
l <Error message>:Ifthereisametererror,itisdisplayedinthisline.
l Power:Dependingonthemetertypeconnectedtotheinverter,thislinedisplaystheexportedor
importedpower
l Energy:Thetotalenergyreadbythemeter.Thevaluedisplayedinthislinedependsonthemetertype
connectedtotheinverteranditslocation:
o
Ifabidirectionalmeterisconnectedattheconsumptionpoint,thisvalueistheconsumedenergy.
o
Ifthemeterisinstalledattheproductionconnectionpoint,thisvalueistheenergyproducedby
thesite.
o
Ifthemeterisinstalledatthegridconnectionpoint,thisvalueistheenergyexportedtothegrid.
NOTE
This data is accumulated according to an internal real-time clock.
Reporting and Monitoring Installation Data
NOTE
Monitoring the site requires connecting the inverter to the monitoring platform, using any of the wired or
wireless options available from SolarEdge. Refer to Setting Up Communication on page 44.
The Monitoring Platform
ThemonitoringplatformprovidesenhancedPVperformancemonitoringandyieldassurancethrough
immediatefaultdetectionandalertsatthemodule,stringandsystemlevel.
Usingtheplatform,youcan:
l Viewthelatestperformanceofspecificcomponents.
l Findunder-performingcomponents,suchasmodules,bycomparingtheirperformancetothatof
othercomponentsofthesametype.
l Pinpointthelocationofalertedcomponentsusingthephysicallayout.
Themonitoringplatformenablesaccessingsiteinformation,includingup-to-dateinformationviewedina
physicalorlogicalview:
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter
-Single Phase Inverter with HD-Wave Technology Installation MAN-01-00541-1.0
41