Product Manual
Thank you for the purchase of our Wicked Tough Pole Saw. Please take the me to read
through these tape installaon instrucons to get the most from your pole saw.
Tape Installation: Along with your Wicked Tough Pole saw, you should have also
received (4) pieces of “Two-Sided Tape” inside the plasc bag. The below instrucons
will show you how to properly install these pieces of tape between the “Tube Connector
Brackets”; and the “Aluminum Tube Secons”. Without the installaon of this tape, it is
possible for the brackets to be pulled o the end of the aluminum tubes when any secon
is not fully extended during use. The Two-Sided Tape applicaon eliminates this problem.
Please note, each tube secon has male/female rolled groves that prevent the tubes from
pulling apart. The tape prevents the connectors from pulling o the tube ends when any
secons are closed or adjusted part-way. This simple operaon will permanently connect
the plasc bracket to each tube end. It’s worth taking the me to do, and should take less
than 10 minutes from start to nish. See instrucons below:
Tools Required: (1) Flat Screw Driver (Large Size), (1) Phillips Head Screw Driver
(Medium Size)
Step 1: Unscrew “Phillips Head Screw” from the largest “Tube Connector “(closest to
boom of pole saw). Be sure to save the screw and nut to re-install later.
Step 2: Slide plasc “Tube Connector Bracket” o the end of the “Aluminum Tube” with a
twisng moon. It should easily slide o tube end with nut and bolt removed.
Step 3: Clean tube end with dry / clean rag to allow for good adhesion with two-sided tape
.
Step 4: Remove one side of “Two-Sided Tape” cover strips. Wrap the tape around the end
of the aluminum tube (scky side on aluminum tube). Tape should be near the end of the
aluminum tube (within 1/4 inch), but is it not crical where the tape starts or stops.
Step 5: Remove outer tape cover strip, exposing “scky” side of tape on the outside.
Step 6: Insert “Flat Screw Driver” into gap of the “Plasc Connector Bracket”. Rotate
screw driver 90 degrees to further open the connector bracket. This will allow you to easily
slide bracket back over the tube and tape.
Step 7: With the “Flat Screw Driver” holding the “Connector Bracket” open, slide the
“Connector Bracket” back over the tube end unl it hits aluminum tube end. It is crical
that the “Connector bracket” is slid unl it hit’s it’s stopping point. This should be felt when
pushing the connector back onto tube. Once “Connector bracket” is back in its original
posion, remove screw driver.
Step 8: Re-install “Screw” and “Nut” and ghten to medium strength. The two-sided
tape should be installed now between the tube and connector bracket, which will create a
permanent bond once the “Screw” is ghtened. If using a baery powered drill, a torque
seng of #2 or #3 will be sucient. If when ghtening the screw the nut starts rotang at
any-point, it’s ght enough.
Step 9: Repeat steps 1-8 for each of the “Tube Connector Brackets”. The 12 . Pole Saw
will have (4) brackets, the 6 . Pole Saw will have (3) brackets. There will be (1) extra piece
of tape provided for the 6 . assembly that will not be used.
step 10: When applying tape to the addional tubes; open tube secons slightly to allow
for easier access to perform the above assembly. The “Tube Adjustment Knobs” can either
be loose or ght while performing these operaons.
If you have any questions about the above instructions, please contact Wicked
Tree Gear by phone at 319-217-0885, or email at info@wickedtreegear.com
Tape Installation Instructions
Wicked Tough Pole Saw
STEP 1
STEP 2
STEP 4
STEP 6
STEP 7
STEP 10