User Manual

+
1
2 2
3
5 5
6
4 4
Fig. 12: Measurement setup, ow measurement in liquids
1 Orice or impact pressure probe
2 Blocking valves
3 DPT10
4 Precipitator
5 Drain valves
6 3-fold valve block
4.4 Measurement setup level
à Mount DPT10 below the lower measurement connection so that
the eective pressure lines are always lled with liquid
à Minus side is open to the atmospheric pressure
In open vessels with
eective pressure line
18 Dierential pressure transmitter DPT10 - metal measuring diaphragm F oundation Fieldbus
4 Mounting
37246-EN-100120