Instruction Manual
Danger:
Instruments in the version "Oil and grease free for oxygen" should be
unpacked just before mounting. After the protective cover of the
process fitting has been removed, the label "O₂" on the process fitting
is visible. Contamination by oil, grease and dirt should be avoided.
Danger of explosion!
4.2 Mounting instructions
IPT-1* Vers. 3.0 functions in any installation position. It is mounted
according to the same directives as a manometer (DIN EN 839-2).
3)
Information:
We recommend using lock fittings, measuring instrument holders and
siphons from the line of WIKA accessories.
4.3 Mounting steps
To mount IPT-1* Vers. 3.0, a welded socket is necessary. Use
components from the line of WIKA mounting accessories.
à Note the applicable welding standards (segment welding proce-
dure) when welding the socket.
Use the seal corresponding to the instrument:
l Process fitting GD: Tesnit seal in front of the thread
- or -
Seal the thread with teflon, hemp or a similar resist ant seal material:
l Process fitting GN
à Screw IPT-1* Vers. 3.0 into the welded socket. Tighten the
hexagon on the process fitting with a suitable wrench. Wrench
size, see chapter "Dimensional drawings".
Warning:
The housing must not be used to screw the instrument in! Applying
tightening force can damage internal parts of the housing.
3)
Probable position correction see chapter "Setup steps".
Oxygen applica-
tions
Mounting position
Welding the socket
Sealing/Screwing in
12 Process pressure transmitter IPT-1* Vers. 3.0 - metalic sensor • Profibus PA
4 Mounting
31544-EN-081211










