Manual
2
1. Brewer should be ON (Conrm at the rear toggle switch). The LCD screen should read Ready to Brew.
2. Place an empty ThermoPro 2 gallon server under the brewcone.
6. Touch desired
brew button.
Brewing will begin
immediately.
5. Transfer lled
brewcone to
brewer.
3. Place a clean lter
into the brewcone.
4. Fill brewcone with
ground coffee.
COFFEE BREWING INSTRUCTIONS
WARNINGTOAVOIDSCALDING,Donotremovebrewconewhilebrewlightisashing.
Touch Screen Control Module
The touch screen turns on when power is available to the controller. The screen will contain standard control feature such as symbols and buttons. Pressing these elements with
your nger tip will activate the programming functions. The default screen, as well as some added control buttons are shown in the illustration below.
STATUS LIGHTS
BREW BUTTONS
CURTIS LOGO
TO ENTER PROGRAMMING
Tap Curtis logo 5 times to bring
up the ACCESS CODE screen.
RETURN TO HOME SCROLL RETURN TO PREVIOUS
UNDO
CONTROL SYMBOLS
All of these symbols may not
be visible at one time.
Your Curtis G4/Gold Cup Series is Factory Pre-Set for Optimum Performance.
After connection to water and power; turn on the brewer at the rear toggle switch. You will hear a beep and the status lights will come on for a moment.
The screen will display . Next is displayed. Water will ll the tank (2-3 minutes depending on water ow rate).
When the proper level is reached will appear on the screen. It takes approximately 30 minutes to reach the set point temperature.
Control will display when temperature reaches the set point. The unit is now ready to brew.
MODEL NUMBER
CONTROL BD NUMBER
READY TO BREW
HEATING
FILLING