Installation Guide

Model 720A
Pressure Vacuum Breaker
(1/2", 3/4", 1", 1 1/4", 1 1/2" & 2")
Fig 1
INSTALLATION INSTRUCTIONS
CAUTION: Installation of Pressure Vacuum breakers must be performed by qualied,
licensed personnel. Faulty installation could result in an improperly functioning device.
The installer should be sure the proper device has been selected for the particular installation.
ZURN WILKINS Model 720A Pressure Vacuum Breakers are for use on irrigation, industrial,
and other non-potable services where a health hazard could exist if a backsiphonage situ-
ation were to occur. They must not be installed where backpressure may occur.
Proper performance depends upon following these installation instructions and prevailing
governmental and industry standards and codes. Failure to do so releases ZURN WILKINS
of any liability that it might otherwise have with respect to that device. Such failure could
also result in an improperly functioning device.
1. Before installing the ZURN WILKINS Model 720A Pressure Vacuum Breaker, ush the
lines thoroughly to remove all debris, chips and other foreign matter.
2. The Model 720A must be installed in a vertical position (see Fig. 1) to provide proper
operation of the air inlet valve.
3. Provide adequate space around the installed unit so that the test cocks will be acces-
sible for testing and servicing.
4. CAUTION: If installation of a Model 720A unit is in a building, provide a suitable
drain arrangement to drain off spillage from the air vent.
5. Install valve at least 12 inches above the highest piping or water outlet downstream of
the Model 720A Pressure Vacuum Breaker.
6. Always consult local codes for installation methods, approvals and guidance.
7. The Model 720A Pressure Vacuum Breaker may be installed outdoors only if the de-
vice is protected against any freezing conditions. Warning: do not block air vent open-
ing with insulation. Exposure to freezing conditions will result in improper function or
damage to the device. The installation location must be kept above 32°F.
PLACING THE DEVICE IN SERVICE
After the installation of a Model 720A Pressure Vacuum Breaker has been completed, place
the unit in service as follows:
1. Start with both shut-off valves and test cocks closed. Open the inlet shut-off valve until
the Pressure Vacuum Breaker is completely pressurized.
2. A brief discharge from the air vent may occur while the device is pressurizing. The
discharge should cease by the time the shut-off valve is in the full open position.
Installation Testing Maintenance Instructions
3. If the discharge does not stop, refer to
“MAINTENANCE INSTRUCTIONS”.
Repressurize device as in Step 1.
Device should function properly.
4. Slowly open the No. 2 shut-off valve.
The Model 720A is now in service.
5. After the Model 720A has been prop-
erly installed, test the device. If the
device fails the test, refer to “MAINTE-
NANCE INSTRUCTIONS”
Drain Procedure for Freeze Protection
1. Turn off main shut-off (1) that supplies
water to the system.
2. Open both inlet and outlet drain valves
in the system (2 & 6). Open inlet and
outlet shut-off valves on the pressure
vacuum breaker (3 & 5) and all of the
test cocks. Leave all valves and test
cocks in the half open/half closed (45°)
position to allow full drainage of the
ball valves and test cocks.
3. If you "blow out" the system down-
stream of the pressure vacuum break-
er, make sure the outlet drain valve
(6) is open and the pressure vacuum
breaker shut-off valve (5) is closed.
4. Connect an air hose to the outlet
drain valve (6) and inject an adequate
volume of air to remove all water from
the downstream portion of the system.
5. CAUTION: Open outlet shut-off valve
to the pressure vacuum breaker (5)
and outlet drain valve (6) to the half
open/half closed (45°) position after
"blow out" process is completed.
6. If drain valves (2 & 6) are not part of
the system, and if air pressure is not
used to "blow out" the system, the
internal components of the pressure
vacuum breaker should be removed
for the duration of the winter.
7. Leave all drain valves (2 & 6), shut-off
valves (3 & 5) and test cocks in the
half open/half closed position (45°) for
the duration of the winter to prevent
freezing. Caution: Be certain that main
shut-off (1) remains tightly closed to
prevent relling of the system. Also,
the main shut-off valve must be re-
silient seated to insure no leakage of
water into the system.
TESTCOCKS (4)
1” 720A PVB
(25MM)
OUTLET SHUT OFF
VALVE (5)
OUTLET DRAIN
VALVE (6)
MAIN SHUT-OFF
VALVE (1)
INLET DRAIN
VALVE (2)
(If allowed by
local codes)
TO IRRIGATION
SYSTEM
DRAIN
DIRECTION OF FLOW
INLET
SHUT OFF
VALVE (3)
WARRANTY: ZURN WILKINS Valves are guaranteed against defects of material or workmanship when used for the services recom-
mended. If in any recommended service, a defect develops due to material or workmanship, and the device is returned, freight prepaid,
to ZURN WILKINS within 12 months from date of purchase, it will be repaired or replaced free of charge. ZURN WILKINS' liability shall
be limited to our agreement to repair or replace the valve only.
®
WARNING: This product is NOT Lead Free in accordance with U.S. Federal Law and is illegal in the U.S. for use in potable services or to
install in water systems anticipated for human consumption.
! WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
! ADVERTENCIA: Cáncer y daño reproductivo - www.P65Warnings.ca.gov
! AVERTISSEMENT: Cancer et néfastes sur la reproduction - www.P65Warnings.ca.gov

Summary of content (2 pages)