Installation manual Dimensions: D0” HF2” 128 Bulb Typesetter bulb not included Lamp Frame Weight Total That you For choosing our product(s). Our Company is actively involved in every step of the production. Our product(s) are designed to be utilized for every application that graces your home of business. We pride ourselves in providing the most prompt and courtesy service to all of the valued customers. Please find the enclosed detailed instruction and read carefully for proper installation.
D30” H72” L28 SAFETY Warning: MAKE SURE THE ELECTRICITY TO THE WIRES YOU ARE WORKING ON IS SHUT OFF.BY EITHER REMOVING THE FUSE OR TURNING OFF THE CIRCUIT BREAKER. CAUTION — Before assembling the lighting fixture, please read all instructions carefully. — All frame & crystal components are fragile, please handle with care Required supply circuit : 110 130V/60Hz — Labeled wires are “L” for live wire, “N” for neutral wire, “E” for ground wire.
D30” H72” L28 Step 1 Please use the parts list to ensure you are not missing any parts D30” H72” L28 PARTS LIST part picture Description Qty | Check list ZA 4"Mounting bracket| 1 ZB = cover Canopy ring 1 L59% ID CANOEIST Twist Design 1 Power Cord 12’ IE |r Supt-2-18% Marigold 1 P1 Loop 8”Iron bracket 3 P3 bracket Metallica ring Law body) |! Pé 4"Metal wire box| 1 part picture Description Qty | Check list P7 B Hickey 3 Pg 4"Metal plate 1 P9 Coupling 5 13"Both end P10 Threaded pipe 1 P11 12.
D30” H72” L28 D30” H72” L28 part picture Description Qty Check list part picture Description Qty | Check list P20 Ion Metal strip 1 p21 [J E12 Lamp holder | 28 attached with A ae lamp body 1502-10811 Spectrometers 48 C | deaden | 36 D ane | 222 E | seed 139) F p-eedos | 319
D30” H72” L28 step 2 Canopy Installation Instruction Tighten the nut up and down Canopy loop Hot wire "N" = Neutral wire "E" = Ground wire D30” H72” L28 IMPORTANT : Test sockets with bulb before dressing the fixture. 1 .Drill a 90.7" hole in the ceiling reinforcement to allow a 4g” threaded rod to pass through. 2 . Attach the electrical box to the ceiling reinforcement and pass the Ys threaded rod through the box and secure it to the heavy duty hickey. 3 .
D30” H72” L28 Frame Assembly Diagram D30” H72” L28 Step 3 Frame Assembly Instructions Installation: Please read all instructions carefully. Before you proceed to install, make sure. that the power supply is turned off and remains off until installation is complete. Please note that each part has been assigned a number. Please proceed in a numerical order, 1. Hang the chain (01) on the ceiling. 2.
D30” H72” L28 Step 4 Crystal Dressing Instructions 1. Hang crystal "A”part attached to the lamp body. D30” H72” L28 Crystal Dressing Diagram When dressing the chandelier with the crystals please remember & to wear either rubber or cotton gloves. So as to prevent any damage or smudging on the crystals.
D30” H72” L28 Congratulations ! You are now done installing your chandelier fixture. Sit back and admire each crystal as it will become the statement piece for your room/house If you require any additional assistance, please contact us Thank you. D30” H72” L28 Cleaning and Maintenance of Chandelier Frame The finish on our chandelier frames and fixture frames is protected by a durable coating of lacquer. To clean, use a clean, soft, dry cloth.
D30” H72” L28 Warranty The finish and frame of your new chandelier or fixture are warranted for a period of from the date of purchase. Our company will at its option, repair or replace any frame that has a defect in the material or workmanship during the warranty period. All crystals are guaranteed for their original quality during the life of the chandelier. Breakage is not covered by this warranty.