Operating instructions
2
Part Number 550-142-784/0812
GWA
Series 2 Gas-Fired Water Boilers – Boiler Manual
Installations must follow these codes:
• Local,state,provincial,andnationalcodes,laws,regulations
and ordinances.
• NationalFuelGasCode,ANSIZ223.1–latestedition.
• StandardforControlsandSafetyDevicesforAutomatically
FiredBoilers,ANSI/ASMECSD-1,whenrequired.
• NationalElectricalCode.
• ForCanadaonly:B149.1orB149.2InstallationCode,CSA
C22.1CanadianElectricalCodePart1andanylocalcodes.
Certification
TheGWAboilergasmanifoldandcontrolsmetsafe
operatingandotherperformancecriteriawhenboiler
underwent tests specied in ANSI Z21.13–latest
edition.
Before locating the boiler:
o Checkfornearbyconnectionto:
• Systemwaterpiping
• Ventingconnections
• Gassupplypiping
• Electricalpower
o Checkareaaroundboiler.Removeanycombustiblematerials,
gasoline and other flammable liquids.
Failuretokeepboilerareaclearandfreeofcom-
bustible materials, gasoline and other flammable
liquids and vapors can result in severe personal
injury, death or substantial property damage.
o Boiler must be installed so that gas control system components
areprotectedfromdrippingorsprayingwaterorrainduring
operation or service.
o Ifnewboilerwillreplaceexistingboiler,checkforandcorrect
system problems, such as:
1. Systemleakscausingoxygencorrosionorsectioncracks
fromhardwaterdeposits.
2. Incorrectly-sizedexpansiontank.
3. Lackofantifreezeinboilerwatercausingsystemandboiler
tofreezeandleak.
Codes & checklist
Failure to adhere to the guidelines below can
result in severe personal injury, death or sub-
stantial property damage.
When servicing boiler —
1. To avoid electric shock, disconnect electrical supply
beforeperformingmaintenance.
2. Toavoidsevereburns,allowboilertocoolbeforeper-
formingmaintenance.
Boiler operation —
3. Donotblockowofcombustionorventilationairtoboiler.
4. Shouldoverheatingoccurorgassupplyfailtoshutoff,do
notturnoffordisconnectelectricalsupplytocirculator.
Instead,shutoffthegassupplyatalocationexternalto
the appliance.
5. Donotusethisboilerifanyparthasbeenunderwater.
Immediatelycallaqualiedservicetechniciantoinspect
theboilerandtoreplaceanypartofthecontrolsystem
and any gas control that has been under water.
Boiler water —
6. DO NOT use petroleum-based cleaning or sealing
compounds in boiler system. Water seal deterioration
will occur, causing leakage between boiler sections,
circulator anges, diaphragm tanks or other system
components. This can result in substantial property
damage.
7. DO NOT use “homemade cures” or “boiler patent
medicines”. Serious damage to boiler, personnel and/
or property may result.
8. Continualfreshmakeupwaterwillreduceboilerlife.Min-
eralbuildupinsectionsreducesheattransfer,overheats
castiron,andcausessectionfailure.Additionofoxygen
and other gases can cause internal corrosion. Leaks
in boiler or piping must be repaired at once to prevent
makeupwater.
9. Donotaddcoldwatertohotboiler.Thermalshockcan
causesectionstocrack.
Glycol — potential fire hazard —
Allglycolisammablewhenexposedtohightemperatures.If
glycol is allowed to accumulate in or around the boiler or any
otherpotentialignitionsource,arecandevelop.Inorderto
prevent potential severe personal injury, death or substantial
propertydamagefromreand/orstructuraldamage:
• Never store glycol of any kind near the boiler or any
potential ignition source.
• Monitorandinspectthesystemandboilerregularlyfor
leakage.Repairanyleaksimmediatelytopreventpos-
sibleaccumulationofglycol.
• Neveruse automotiveantifreezeor ethyleneglycolin
thesystem.Usingtheseglycolscanleadtohazardous
leakageofglycolintheboilersystem.
1 Prepare boiler locationRead this first!
The boiler contains ceramic fiber and fiberglass
materials. Use care when handling these
materials per instructions on page 39 of this
manual. Failure to comply could result in severe
personal injury.