Operating instructions
9
Part Number 550-142-784/0812
GWA
Series 2 Gas-Fired Water Boilers – Boiler Manual
Figure 4 Vent damper assemblies
Damper installation
Donotmodifydrafthoodorventdamper,ormake
another connection between draft hood and vent
damperorboiler exceptasnotedbelow.Thiswill
voidCSA certication andwillnot be coveredby
warranty.Anychangeswillcauseseverepersonal
injury, death or substantial property damage.
1. Installventdamperhorizontallyorverticallyasshowninvent
damper manufacturer’s instructions.Vent damper must be
installed so that it serves only one boiler and so damper blade
indicator is visible to the user. See Figure 4.
2. Screwsorrivetsusedtosecuretheventdampertothedraft
hoodmustnotinterferewithrotationofthedamperblade.
3. Installdamperharnessbetweendamperactuatorandholein
jacketleftsidepanel.SeeFigure 3, page 8.
Usestrainreliefconnectorsandlocknutstosecurebothends
ofdamperharness.
Keep wiring harness clear of all hot surfaces.
Wireinsulationcouldbedamaged,causingriskof
electrical short-circuit.
4. Read and apply the harness plug warning label (shown upper-
left)sothatitisvisibleafterinstallation
5. Plug damper harness receptacle into damper harness plug.
Bypassing (jumpering) vent damper will cause flue
productssuchascarbonmonoxidetoescapeinto
the house. This will cause severe personal injury or
death.
After boiler has operated once, if either end
of harness is disconnected, the system safety
shutdown will occur. The boiler will not operate until
harness is reconnected.
Efkal or Field Controls damper — Damper hold
openswitchmustbeinAutomaticOperationposition
forsystemtooperateproperly.
Vent damper continued
2 Prepare boiler continued
Effikal or Field
Controls damper
Johnson Controls damper
72519
Damper
blade
indicator
Hold-open switch (Effikal only) —
Install vent damper so that switch
is visible and accessible to user.
Refer to vent manufacturer’s instructions to install
plug (shipped with damper) in damper hole.