Installation & Assembly

Installation Procedures:
a.
Open
package
and take
out
all the parts
or
accessories,
n
place
em
on
a clean flat place.
b.
Please
turn
off
the
power
first.
c.
Fix
the
the'frame
1'with
the'light
fixture
body
3'by
using
the'screw
2';
Connect
the
'frame
1'with
the'canopy
S'by using
the'chain
connector
4'.
d.
Fix
the'bar
6'to
the
ceiling
by
using
the'screw
7',
connect
light fixture's wires
with
the
outlet
box's
wires correctly
and
firmly
by
using
the'wire
nut
8'(you
can
cover
insulating
tape
to
the
wire
nut
for
a
more
secure).
A
B
Wire
connecting
detailed
steps:
G)
Identify the light fixture's live wire and neutral
wire by L
and
N label (L means live wire, N
means neutral wire).
I ~
DIMPLES
O
骂芯
@ Attach the sup~ly black live wire to the fixture
1
GRE
EN
GROUN
D
GREEN
GROUND
CUPPED
live wire by using a wire nut.
sc
REw
SCREW
WAS
HER
®Attach
the supply white neutral wire
to
the fixture neutral wire by using a wire nut.
@
Loop
the supply copper ground wire around the ground screw
of
the'bar
6'. Then, tighten
the
ground
screw.
®Connect
supply
copper ground wire
to
fixture
copper ground wire by using a wire
nut
and
place all wires inside the outlet box.
e.
Use
e'screw
nut
9'to
fix
e'cover
plate
5'to
ceiling
fi
y
then combine
the'lamp
shade
10'to the lamp base with
the'socket
nut
11, insert the'light bulb
12'and
screw into the socket
snugly
(3
pcs
E26
bulbs
not
included in package).
f.
Check
everything
installed correctly,
then
you
can
turn
on
the
light.
Remove
or
add chain :
-3
_.--
10
..,...
_
11
,
I
\一
12
To
spread
a
link
of
chain:
Use
a
pair
of
pliers
and
a
screwdriver
as shown below, being careful
to
wrap the jaw
of
e
pliers with cloth
to
protect
the
finish
of
the
chain.