Specifications

24
Operation
5s
RESET
5s
RESET
5s
RESET
5s
RESET
5s
RESET
Fig. 53
Fig. 54
Fig. 55
Fig. 56
Press the
Menu
button – Fig. 54.
Confirm the selected menu item „Operator level“ by pressing the
Choose
button – Fig. 55.
Use the
arrow
buttons to select the „Boiler cleaning“ sub-menu
item – Fig. 56.
Confirm the selected „Boiler cleaning“ sub-menu item by pressing
the
Choose
button – Fig. 57.
Fig. 57
Boiler temperature
(Operating phases)
Lighting ON
42
°C
Boiler temperature
(Operating phases)
Info Menu
42
°C
Operator level
Service level
Choose Back
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose Back
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose Back
2.10.1.1 Boiler cleaning -
Resetting the cleaning request
After boiler cleaning has been performed (section 3.1), boiler cle-
aning must be confirmed so that the operating time until the next
boiler cleaning is restarted.
Pressing one of the six buttons switches the lighting and display
on – Fig. 53.
Boiler cleaning must not be reset if cleaning has not been
carried out.