Specifications

36
5s
RESET
5s
RESET
5s
RESET
5s
RESET
5s
RESET
2.10.1.6 Time profile ash compression (Exklusiv version only)
The ash in the ash pan is only compressed at the 2 set start times
and when approx. 15 kg of fuel has been consumed. The start times
can be set in steps of 15 minutes (start time 1 and start time 2).
Factory setting: Start time 1: 08:00
Start time 2: 22:00
Pressing one of the six buttons switches the lighting and display
on – Fig. 104.
Fig. 104
Fig. 105
Fig. 106
Fig. 107
Press the
Menu
button – Fig. 105.
Confirm the selected menu item „Operator level“ by pressing the
Choose
button – Fig. 106.
Use the
arrow
buttons to select the sub-menu item Time profile
ash comp.“ – Fig. 107.
Confirm the selected sub-menu item Time profile ash comp.“ by
pressing the
Choose
button – Fig. 108.
Fig. 108
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose Back
Boiler temperature
(Operating phases)
Lighting ON
42
°C
Boiler temperature
(Operating phases)
Info Menu
42
°C
Operator level
Service level
Choose Back
Operation
Boiler cleaning
Time
Feed operating mode
Time profile feed
Probe switching
Time profile ash comp.
Choose Back