Specifications

6
1.6 Filling the pellet store
Fig. 2 Switching off the VarioWIN
Important information for system operators
1.5 Operating noises
The VarioWIN is a modern, fully automated pellet central heating boiler with a high level of convenience in terms
of operation and cleaning. This automation means that operating noises may occur during normal operation.
Normal operating noises are:
Flame noises
– Natural flame noise can be heard depending on the size of the flames.
Light scratching and scraping noises
– Depending on the level of contamination, cleaning noises may occur
during automated cleaning or shake-out. If these become louder over time Clean the pellet central heating
boiler, especially the burner pot.
Trickling of pellets and vacuum cleaner noise
– Fully automated pellet supply involves pellets being sucked from
the storage room into the reserve supply container. During filling, the suction turbine generates a „vacuum cle-
aner noise“ in the storage room and the feed hose, and the trickling of the pellets can be heard in the reserve
supply container.
Clicking noises
The relays switch on or off when the control unit is installed.
Liquid noise, gurgling
This is caused by air in the heating water Bleed the system.
Air induction noises
Air induction noise occurs at the air supply induction point for combustion (air opening
in the device) Use air supply pipes to relocate the induction point outside the house or into an adjacent room.
Note:
Due to these operating and flame noises, we do not recommend installing the device in bedrooms or
quiet rooms – see also the information in the VarioWIN „Assembly instructions“.
The pellet boiler must be switched off correctly at least 15 minutes before the store is filled – Fig. 2.
Press the ON/OFF button. Never switch off using the emergency OFF switch!
Pressing one of the six buttons firstly switches just the
lighting and display on. The boiler is only switched off
when the button is pressed for the 2nd time. Wait until
burnout mode has finished (not indicated on the display)
and open the combustion chamber doors.
During filling, negative pressure is created in the pellet
store and this can cause burn-back in the pellet boiler. The-
refore, the boiler must be stopped from operating during
the filling procedure.
Fig 2a „Storage room fill“ sticker on the
storage room door
Every storage room fill should be documented by adding
the date and volume to the „Storage room fill“ sticker –
Fig. 2a.
002357/00
01/2010
Befüllung Lagerraum
Filling date and volume
Remplissage du silo de stockage
Datum/Date/Date
Menge/Volume/Quantité
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg