Operation Manual

W.BodySize
23
8-3/8
5
2°
30(36)(42)(48)
22-7/16
11
V.RecirculationKitInstallation(optional)
(1).Mounttherecirculationkittothebottom
ofthecabinet.(Usethewoodscrews
providedwithrangehood)
(2).Aftersecuringtherecirclationkittothe
bottomofthecabinet,makesuretorun
thepathfortheelectricalpowercord.
(3).Beforemountingtherangehood,
besuretoconnecttheelectrical
powercord.Mounttherangehood
usingthescrewsporvidedtothe
bottom(4sides)oftherecirculationkit.
(30-5pcsscrews)
(36 /42 /48-9pcsscrews)
(4).Beforepoweringtheunit,makesureall
screwsandpowercordhavebeen
properlyconnected.Afterallconnections
havebeensecuredyourrecirculating
rangehoodisreadyforuse.
Note:Beforemountingtherangehoodandrecirculationkit,pleasemustreferthe
followingfromthemanual.
1.P.5 E.PreparingtheRangeHoodremovethetopelectricalknockout
(recirculationkitissamestep)
2.P.7 ,P.13 M.MountingRangeHoodToCabinet .
3.P.8 H.RemoveandReinstallBafflefilters .
G.Providingelectricalpower
(1) (2) (3) (4)