Specifications

Project Name/Project Number/17-Feb-10 11 41 12 - 14 Wine Storage Equipment
Wine Cellar Innovations Residential Wine Rack Kits
C. Install ductwork.
1. Verify three feet of straight ductwork precedes coil inlet.
(Specifier Note: DELETE controls paragraph and subparagraphs below when split air
system is not specified.)
D. Install controls.
1. Mount controls near air handler unit.
2. Link controls to control panel in condenser.
3. Check for proper connections before applying power.
4. Set controls according to manufacturer’s instructions.
E. Install field wiring.
1. Verify proper voltage, maximum fuse and wire size.
2. Install all equipment according to National Electric Code, and all local
codes and ordinances.
3.5 CLEANING AND PROTECTING
A. After completing installation of equipment, repair damaged finishes.
B. Clean and adjust equipment as required to produce ready-for-use condition.
C. Protect equipment from damage during remainder of the construction period.
END OF SECTION