Instructions / Assembly

1
Prepare Your Doors
※Hardware Installation
Step 1: Attach Steel Hangers to Your Doors
a.Drill 7/16”holes at the distances from the top of the doors shown in the above
chart.Note: The Hanger Bolts are inserted through the back of the door (i.e. the Hanger
and Acorn Nuts attach to the front face of the door).
b
.Attach Hangers with the Hanger Bolts, Washers and Acorn Nuts as shown below.
1-9/16”
3-9/16”
※Chart: Track Junction
Installation Manual
Barn Door Hardware
www.winsoonhardware.com
● Installation Tools
Pencil Level RatchetWrenchRuler
Drill
Router
※Check the Quantities
Note: If you encounter any problem with the package and the following installation,
please email us at info@winsoonhardware.com. Please also tell us your “ORDER
ID,” we will solve any issues for you as soon as possible.
Steel
Hanger
Door
Stopper
Anti-jump
Pad
Junction
Plate
Double Door Hardware Kit Includes
Part Name Flat Track
picture
Lag Bolt
Spacer
9FT
44 24
4
6 6 6
2
Floor
guide
Bypass
Bracket Suit
1-3/4in
8” 16”
16”
14”
9FT
16” 16” 8”14”

Summary of content (5 pages)