User's Manual

Draft
RT System 2 v2.0.0 11 Deployment Guide R00.e
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
2
2. Layout
This chapter describes how to prepare (mobilization) and layout (install) the
ground electronics. See the RT System 2 Installation Guide for instructions on
setting up the recording truck equipment and software.
2.1 Prerequisites
In preparation for mobilization, define the following:
Survey
Backhaul plan
2.2 Getting Ready
Collect all of the following:
RT System 2 ground equipment (05-0007):
5 Mbps WRUs (10-0017)
LIUs (see “Backhaul Components” on page 26)
One of the following antennas:
9 dBi antenna (65-0067)
7 dBi antenna (6060-001-01)
5 dBi antenna (65-0023)
2 dBi antenna (65-0025)
Geophones
WRU Batteries (0400-001-01)
WRU Dummy Batteries (55-0009)
Antenna Extenders
Fiber Backhaul
Tools
Manuals
NOTE
Please refer to “Antenna Specifications” on page 81 for the list of
supported antennas. Use of accessories other than those specified in
this document is not supported or warrantied.