2.3 Preparing the Equipment
Ensure that the central recording system has the latest software available installed
(see the RT System 2 Release Notes for version numbers, see the RT System 2
Installation Guide for installation and update instructions).
Ensure that the ground equipment has the latest firmware available installed (see
the RT System 2 Release Notes for version numbers, see the RT System 2
Installation Guide for installation and update instructions).
Ensure that the industry standard best practices are followed for securing the
equipment for transport.
2.4 Laying Out the Equipment
You can lay out the ground equipment while the central recording system
hardware and software is being prepared.
NOTE
The batteries (when fully discharged) require 8 hours of continuous
charging in the battery charger connected to an AC source; therefore,
the battery charger should be located at the staging area or in town.