User's Manual

Draft
R00.e RT System 2 v2.0.0 Deployment Guide 21
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
2. Layout
Laying Out the Equipment
3 Place the unit flat on the ground as shown in the following figure:
4 The unit will begin a series of internal and external tests. The LEDs on the top
of the unit indicate the current test and whether the unit passes or fails each
test.
Figure 2–9 Power on the Unit
Figure 2–10 Place the Unit
NOTE
See “D. LED Indicators” on page 91 for an explanation of the LED status
and error conditions.
If a WRU self test fails, the WRU will continue to the next test.
You can skip a self-test by tipping the WRU geophone down and then
returning it to the upright position (flat on the ground).