User's Manual

Draft
28 RT System 2 v2.0.0 Deployment Guide R00.e
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Backhaul Components
Before the Central Software System can communicate with the LIU, you must set
up the backhaul.
Ensure that the LIU is grounded. Attach a ground wire to the case, and to a nail
that is driven into the ground.
The ground wire is illustrated in the following figure:
3.2.1.2 Battery and Power Supply
Power is supplied to the LIU components by way of a 12 V DC battery or power
supply.
3.2.1.3 Cables
The following cables are used in the backhaul:
LIU to Battery (60-0034)
Ethernet Cable, 30 ft (65-0036)
Ethernet Cable, 60 ft (60-0037)
Ethernet Cable, 120 ft (60-0038)
Cable, LIU-to-PC (60-0039)
Fiber Optic Cable
NOTE
See “D. LED Indicators” on page 91 for an explanation of the LED status
and error conditions.
CAUTION
Attach the LIU ground wire and the Surge Protector ground wire to the
same nail.
Figure 3–5 LIU
Ground
TIP
The backhaul power requirements vary depending on the hardware in
use and period of use. For example, you may be using one or two
radios. Supply enough power to ensure there is enough power for the
entire duration of the time you are using the backhaul.