User's Manual

Draft
50 RT System 2 v2.0.0 Deployment Guide R00.e
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Setting up the Backhaul Equipment
To install the backhaul components and erect the mast:
1 Prerequisites:
Gather the components
Screwdriver
Hammer
2 Refer to the deployment instructions to determine the location and compass
heading to the next back haul site closer to central.
3 Use the compass to determine and mark that direction.
4 Use the following considerations while positioning the base:
Locate the base such that the three guy lines and the mast clear
obstructions during erection and while in operation.
If the ground is sloped, position the base such that when the base is flush
to the ground, the bracket orientation allows the mast to remain
perpendicular to the ground as shown in the following figure:
If the wind is blowing, the mast is more stable when the brackets are
perpendicular to the wind as shown in the following figure:
NOTE
There are many possible mast options; the following instructions are a
general guideline.
Figure 3–28 Mast on a Slope