User's Manual

Draft
54 RT System 2 v2.0.0 Deployment Guide R00.e
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
3. Backhaul
Removing the Backhaul Equipment
2 Attach two radios to the mast. Refer to the deployment instructions for the
location at which to aim the radio. One should point towards the recording
truck (uplink), and the other should point towards the next remote backhaul
location (downlink).
3 Connect the two radios with a short Ethernet cable: Radio1/LAN 2 to Radio 2/
LAN 1.
4 Connect Radio 1/LAN 1 to the LIU.
3.7 Removing the Backhaul Equipment
TBD
3.8 Use Cases or Example Deployments
This section shows a few example deployments.