User's Manual Part 1

Draft
16 RT System 2 v2.3.0 Deployment Guide R01.b
© 2010-2013 Wireless Seismic, Inc. All rights reserved.
2. Layout
Laying Out the Equipment
2.4.2 Assembling the Ground Equipment
This section describes the process to assemble the ground equipment prior to deployment.
To assemble the ground equipment:
1 Gather the equipment:
WRU
Antenna
Antenna Extender
Geophone
Batteries
2 Gather any special tools and equipment:
Optional: Nylon grip pliers
Optional: Loctite® 222
Safety gear such as vests, hard hat, and gloves.
3 Attach one or more batteries to the WRU.
Press the battery into the connector.
Flip the bail over the molded area on the end of the battery.
Press the lever until the catch snaps to lock it in place.
AVERTISSEMENT
Afin de se conformer aux normes de la en matière d'exposition aux
radiofréquences (RF), les unités RT System 2 doivent être installées de
manière à garder en permanence une distance minimale de 20 cm entre
la ou les antennes et le corps de toute personne en mode de
fonctionnement normal.
CAUTION
The metal ground equipment can become hot while exposed to the sun. Wear
gloves to handle hot equipment.
PRUDENCE
L'équipement au sol en métal peut devenir très chaud lors de l'exposition au
soleil. Portez des gants pour manipuler l'équipement chaud.
UWAGA
L'équipement au sol en métal peut devenir très chaud lors de l'exposition au
soleil. Portez des gants pour manipuler l'équipement chaud.