User's Manual

Draft
20 RT 1000 v1.3 Deployment Guide R03.d
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Layout
Laying Out the Equipment
2.5 Laying Out the Equipment
You can lay out the ground equipment while the central recording system
hardware and software is being prepared.
The WRU is shown in the following figure:
The BSU is shown in the following figure:
An example geophone is shown in the following figure
Figure 2–3 BSU at Recording Truck Cable
Illustration TBD
Figure 2–4 WRU
Illustration TBD
Figure 2–5 BSU
Illustration TBD
Figure 2–6 Geophone