User's Manual

Draft
R03.d RT 1000 v1.3 Deployment Guide 59
© 2010-2011 Wireless Seismic, Inc. All rights reserved.
Backhaul
Setting up the Backhaul Equipment
8 Insert the electronics carrier with guy line collar into the top of the mast.
Figure 4–31 Inserting the Mast into the Base and
Extending the Mast
Figure 4–32 Inserting the Electronics Carrier into
the Mast