User's Manual

Draft
60 RT System 2 v2.0.0 Deployment Guide R00.e
© 2010-2012 Wireless Seismic, Inc. All rights reserved.
4. Demobilization
Disassemble the WRU
Continue to lift the lever using the bail to push the battery out of the
connector.
5 Secure the equipment in the transport vehicle.
Figure 4–3 Removing the Battery