Cut Sheet

5
FEATURES STANDARD OPTIONS
Communication Devices Ortronics & Activate Connectivity System Devices Other manufacturers
Electrical Devices Pass & Seymour Other manufacturers
Cover Length 12" (305mm) or 18" (457mm) 24" (610mm), 36" (914mm), custom or continuous
Body Length Longest = 10' (3.05m), shortest = 1' (305mm)
Installation Surface mounted Flush mounted (recessed)
Finish Architectural Class II Clear Anodized Custom colors available, consult factory.*
Fittings Mitered Butt joints or custom
Wire Type THHN Stranded Options per specification
Wiring Splices Insulation displacement connectors Continuous wiring or twist-on wire connector
Grounding Conductors Wire gauge per National Electrical Oversized and/or separate grounding wires
Code (NEC) and shared grounding wires
Device Identification Clear self-adhesive polyester label Engraved covers, self-adhesive engraved nameplate,
with black letters colored self-adhesive polyester labels with black letters
Neutrals Shared neutral Oversized and/or separate neutral wires
Pigtails 12" (305mm) feeds and receptacle leads Per specification
Conduit Feeds Raceway drilled at job site with hole saw Entrance end cap
Device Mounting Mounted to cover with 2 counter-sunk Device mounting brackets
#6-32 screws
Record Drawings 3 sets and 2 copies of marked-up blueprints Per job requirements
Submittal Services Detailed Submittal Express Submittal or Submittal Free
ALA4800 Series Raceway Prewired Features
ALA4800 Series Raceway Ordering Process for Prewired Applications
Detailed Submittal The detailed submittal shows exactly how each raceway run will be built (lengths, number and type of receptacles,
wiring schematics, circuiting information, etc.). The contractor and/or distributor must review and correct any information
not clearly indicated on the drawings or specs, approve and return before production can be scheduled.
Submittal Free The Prewired Express Building Plan Checklist is filled out by the contractor or distributor and sent along with plans,
casework, and specs. No submittal is required and the project is scheduled for production upon receipt of all information.
PHASE 1
* Paint chip required for custom colors.
Prewired Raceway gets installers
off the job in 1/3 less time than
conventional raceway installations.
Wiremold Prewired Raceway is
available in a wide range of capacity
and configuration options.
Electrical Plans
Data Plans
Legends &
Schedules
Specifications
Take-Off
Completed
Quote Delivered
Quotation within
48 Hours based
upon complexity
Documents to Rep
Quote
PHASE 2
Place contractor
order with
authorized
Prewired
Distributor.
All bid and order
documents to
Wiremold Project
Services.
Wiremold Project
Manager assigned
and PO acknowl-
edged.
Documents
reviewed for
completeness.
Within 24 Hours
Within 2 Weeks
Purchase Order
Project Launch
Includes Material
Product Sheets,
material list,
Engineered
raceway details,
product place-
ment drawings and
release forms.
Submittals
Within 2-4 Weeks
Return approved
submittal package
with required
revisions and
requested on
site date.
Drawings revised.
Approval & Release
Material pack-
aged & marked
per area, and
shipped with
“as built”
drawings and
documents.
Shipment
PHASE 3