User's Guide

6
Chapter 2
Connecting the CPE Type #1
This section describes how to install 5G CPE as Type #1 configuration.
2.1 Configuration #1 5G CPE Installation Overview
2.2 Open Box Full Set CPE
1. User open box and see both units with the cradle as a whole set
2. USB cable is plugged in and collected at central retention bar
3. DC cable is plugged in and routing from the bottom
4. There is a label on IDU with message “Indoor Receiver Face this inside (towards
you). Please be sure to follow up the instruction when installation.
5. Press the battery button under cradle to enable battery power.
6. Please check the LED on the bottom of cradle.
7. Please plug the power adapter to charge battery till green LED on.
8. Go to next step if Green LED is on.
1
2.3 Site Survey
1. To power up CPE to enter the installation mode by default
2. Connect your phone & the CPE via Bluetooth
3. Please be sure to follow up the instruction to have IDU toward you and ODU face
to outside. Then hold the Cradle, walk around and look for signal
4. Single press pair button to connect to installation AP via BL
5. Follow below procedures to survey 5G signal, and then go to section 2.4.