User's Guide

8
Chapter 3
Connecting the CPE Type 2
This section describes how to install 5G CPE as Type #2 configuration, when Type #1
configuration can’t provide good communication quality. Please be noticed that this
installation need to be done by well trained technicians.
3.1 Configuration #2 5G CPE Installation Overview
1. To assemble LVSKODU with LVPK
2. To decide good location with good signal quality for device installation
3. To install bracket and device
4. To connect to FCL router
3.2 To Assemble LVSKODJ with LVPK
1. To assemble heatsink with ODU.
2. To plug ODU to bottom housing.
3. To put top housing on and fix the housing by screw
4. USB cable from ODU through cable gland, then plug into USB port of LVPK,
fasten cable gland.
3.3 To decide good location for installation
To select the location for device installation that as close to 5G base station as
possible. It will be better that the location for device installation can see the 5G base
station directly without any obstacle (light of sight).
3.4 Install bracket and device
1. To fix bracket on wall.
2. To adjust the angle of bracket
3. To put the device on bracket.
4. To plug Ethernet cable to PoE port of LVPK and assemble the cable grand.
5. To route Ethernet cable
6. To connect grounding wire.