Installation Instructions

CONTENTS
1 Cover, duct
4 Bolt, 5/16" - 18 x 1 1/4"
22 Screw, #12 - 24 x 3/4"
Note: The duct cover must be structurally secured to the
ceiling prior to installing the ventilation hood.
PRO ISLAND HOOD DUCT COVER INSTALLATION
1
Position the duct cover so the threaded inserts are
facing downward.
2
Use the four 3" lag screws provided with the hood to
secure the top of the duct cover to the ceiling structure.
3
If additional structure is available, use the 2" screws
provided to secure the remainder of the duct cover to
the ceiling structure.
3" Lag Screw
2" Screw
2" x 4" Blocking
10" Ductwork
Ceiling Joists
4
Position the island hood under the duct cover and
loosely install the four 1 1/4" bolts provide with the duct
cover.
Note: Verify the electrical supply has been routed to the
appropriate location on the hood prior to connecting
duct work to the hood.
5
Verify the duct cover is aligned with the hood, then
tighten all four bolts.
6
Use the 3/4" screws provided to secure the remainder
of the hood to the duct cover.
1 1/4" Bolt
3/4" Screw
Pro Island Hood Duct Cover Installation
wolfappliance.com 800.222.7820
9012823 REV-A 02/2017
Page 1 of 1
*9012823$REVA*

Summary of content (1 pages)