Installation Guide

817993
E-Series / Convection Microwave Trim Kit
818126 / Rev A / November, 2010
INSTALLATION PROCEDURE:
Cabinet Opening Preparations and Installation of
Mounting Brackets
1. Locate properly grounded 3-prong receptacle within
4” (102mm) from the right side and 4” (102mm) up
from bottom of microwave oven cabinet.
Install the MWC24 with a 120V, 60Hz, on a dedicat-
ed circuit. This outlet must be checked by a quali-
fied electrician to see if it is wired with correct
polarity and is correctly grounded. A GFCI outlet is
not recommended as this may cause product oper-
ation interruptions.
2. Floor of opening should be constructed of plywood
strong enough to support weight of oven (about
100lbs/.45kg). Floor should be level for proper
operation of oven. Check local building code as it
may require that opening be enclosed with sides,
ceiling and rear partition. Proper functioning of the
oven does not require this enclosure.
Top Duct Installation For MWC24
Step 1:
A. Lining up feet of microwave with holes in bottom
duct assembly, place microwave on assembly (See
Figure 1).
B. Assemble top duct. (See Figure 2).
C. Remove existing screws, one from upper right and
one from left rear of oven (See Figure 3).
D. Place top duct assembly on microwave and re-insert
screws (See Figure 3).
CONT
AINS:
QTY DESCRIPTION
1 Frame Assembly
6 Screw, 6-18x1” TPG Type A
2 Screw, #8-15x1/2” Truss HD
1 Top Ductwork
1 Bottom Ductwork
QTY
DESCRIPTION
2 Large Glass Trim
2 Large Foam
2 Large Foam
1 Instructions
E-Series MWC24
Page 1 of 2
Figure 1. Bottom Duct Assembly
The feet of Microwave will sit in these holes.
Figure 2. Top Duct Assembly
Used for
Trim
1” Deep
Used for
Trim >1-1/8”
Deep
Figure 3. Attaching Top Duct to Microwave
Top Duct Assembly
Bottom
Duct Assembly
Back View of
Microwave

Summary of content (2 pages)