Installation & Assembly
Make sure that the pipe connection
is correct and that the test water
has no leakage. After the
installation of the other embedded
components of the showeris completed,
the embedded box and the pipeline
are sealed and fixed with filler.
As shown in the figure, the
external leakage embedded
box is cut off, and the
subsequent control valve
installation can be performed
after the wall is laid.
Open the water source to test whether the left and right inlet pipes are connected
tightlyand without leakage. After the inlet pipe is tested, adjust the flow switch
to be on to test whether the mixed water outlet pipes are tightly connected without
leakage. At the same time, the water retention function is installed according to
the embedded box. Built-in box with self-tapping screws in solid wall is fixed on
the wall.
Spirit level
Spirit level
Spirit level
As shown in the figure, our company's embedded box has a built-in spirit level
to correct the installation of the embedded box. It is best to move the mercury
to the center of the spirit level. If it is not installed properly, it will affect
the panel installation effect.