Operator`s manual

Setup & Operation
Hydraulic Control Operation
Setup & Operation HD92doc042701 2-11
2
2.8 Hydraulic Control Operation
Revisions E7+
See Figure 2-7. Use the five control levers to do the following steps. This gets the mill
ready to load a log.
FIG. 2-7
Rear
Toe Board
Loader
Turner
Clamp
Front
Toe Board
HD002
7