Specifications

Mountain Series
Installation and Operation Manual
39
An ongoing program of product improvement may require us to change
specifications without notice. WS-MS-(4, 5, 6, 7)-RFG-IR,
Revised May 2015. Doc no: M0033.03
info@woodstone-corp.com or visit woodstone-corp.com
wood stone corporation
1801 w. bakerview rd.
bellingham, wa 98226 usa
tf. 800.988.8103
t. 360.650.1111
f. 360.650.1166
OPERATION SEQUENCE
Power on�
Pilot lights�
Pilot does not light, SV-2 times out�
SV-2 valve powers Igniter and opens
Pilot valve to Radiant (rear) burner
SV-2 senses Pilot
flame – Igniter off, SV-2
opens, Burner lights,
Dome Flame Indicator
light comes on�
Floor reaches the Hearth Set
Point temperature, Controller
turns off power to SV-1 to turn
off Underfloor IR Burner
Pilot does not light – SV-1
times out, Controller
flashes “chec”�
BURNER OPERATION SEQUENCE
RFG-IR OVEN - TYPE 2 CONTROLLER
Pilot lights, SV-1 senses Pilot
flame, Igniter off, SV-1 opens,
Underfloor IR Burner lights,
Hearth Heat light on�
Floor temperature below Hearth
Set Point – Controller sends
power to SV-1 valve, SV-1
powers Igniter and opens
Pilot valve�
Radiant burner remains
on until oven Controller
is turned off�
Floor temperature above
Hearth Set Point –
No action�