Instruction manual

WATER SYSTEMS & PIPEWORK
FILLING PRIMARY SEALED SYSTEMS:
Filling the system must comply with one of
the methods shown opposite.
The filling point must be at low level and must
never be a permanent direct fixing to the
mains water supply
.
Filling loops must be WRAS approved.
INSTALLATION
COMMISSIONING
WATER SYSTEMS & PIPEWORK
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL 12/18-18/25-25/32
8 7
16 112 7
00a (02.0
7)
11
PRE -
INSTALLATION