Instruction manual

Unpacking:
It is advised that at least two or more persons are
involved in the transfer of the packaged boiler from
the van to the point of delivery.
1 4 Once the packaged boiler has been
delivered, the outer carton is removed first.
Care should be taken when releasing the
straps. If a sharp implement is used make sure
the outer carton is not pierced and that the
implement is used in suc
h a way so that it may
not cause personal injury. All sharp objects
must be covered or the blade retracted after
use and put away in a safe place.
2 4 Lift carton up and away from the boiler.
4 Remove the plastic bag from the boiler and
place safely aside.
UNPACKING THE BOILER
LIFTING AND CARRYING PRECAUTIONS:
• Lift only a manageable weight, or ask for
help.
When lifting or putting things down, bend
the knees, and keep the back straight
and feet apart.
Do not lift and twist at the same time.
Lift and carry objects close to the body.
Wear protective clothing and gloves to
protect from any sharp edges.
IIMPORTANT: All the previous Pre-Installation sections must be read
and requirements met before starting boiler or flue installation.
1
2
INSTALLATION
U
N
PACKING THE BOILER
I
NSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL 12/18-18/25-25/32
8 716 112 700a (02.07)