Instruction manual

BOILER INSTALLATION
Note: The cabinet is not load bearing it
only provides weather protection for the
boiler inside.
14Mark position of the 100mm services
duct on the exterior wall and make a hole
through.
24Remove the screws from the bottom of
the front and rear panels and pull the
panels out and down to remove. Store
safely away from the installation point.
34Remove the screws from the top panel
and lift up to remove, store safely away
from the installation point.
44Remove the screws securing the control
box to the side panels and carefully rest
the control box on top of the heat
exchanger taking care not to snag or kink
the capillaries.
54Remove the screws securing the side
panels to the base panel and lift the side
panels off complete with the rear support
bar (
shaded grey) and carefully stand the
panels away from the installation point.
6a
4Loosen the flexable air duct clamp (A)
and remove the air duct from the burner.
6b
4Depress the locking ears to unplug the
burner lead (B) from the control box (C).
6c 4Undo the two screws securing the
deflector plate (D) and remove the plate.
6d 4Undo and remove the retaining nut (E)
on top of the burner. The burner
mounting (F) can now be eased
off the lug (G) on the burner collar to
remove the burner from the heat
exchanger. Store the burner and
retaining nut safely away from the boiler.
7
4Remove the screws securing the base
panel to the transit pallet and lift the boiler
off the pallet and into its installation
position taking care not to scrape the
base panel across the hard standing.
Do
not at
t
empt to lift and position the
boiler on your own. Do not use the
copper pipes to move the boiler.
4Fasten the base to the hard standing
using the holes provided. Care should be
taken to ensure that the base is level.
84Refit the side panels and rear support
bar and screw the side panels to the
baseplate and boiler.
4Refit the control box t
aking care not to
kink the capillary tubes.
4Measure the 100mmØ services duct to
give at least 1
0mm inside the casing and
to finish flush with the interior wall
surface, cut to size and fit the duct. Fit the
100mm sealing ring where the duct
enters the casing and seal the joint to the
exterior wall and inside the cabinet with a
suit
able sealant
.
B
O
ILER INSTALLATION
I
NSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL 12/18-18/25-25/32
8 716 112 700a (02.07)
18
INSTALLATION
WARNING: THIS APPLIANCE IS SERVICED AND REPAIRED EXTERNALLY.
EXTERNAL EQUIPMENT OPERATED AT 230V SHOULD NOT BE INSTALLED, SERVICED OR
REPAIRED UNDER ADVERSE WEATHER CONDITIONS.
THIS APPLIANCE IS INSTALLED AND SERVICE EXTERNALLY TO THE PROPERTY, BUT THE
ENGINEER MUST HAVE ACCESS TO THE INSIDE OF THE PROPERTY WHEN INSTALLING
OR SERVICING THE APPLIANCE.
2
2
3
4
5
D
6a
A
6b
B
C
6c
D
6d