Instruction manual
PRE-COMMISSIONING CHECKS -
APPLIANCE
CAUTION: ISOLATE THE MAINS SUPPLIES
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
14Check that the service and water pipes are
connected correctly.
4 Check that all unused sockets are capped
off.
2
4 Check that the oil supply is 28 sec
kerosene and that the pipework is
connected correctly to the oil pump.
4Turn on the main oil supply valve at the tank,
check the oil supply pipework and
connections. Rectify any leaks.
3
4 Check the flue is correctly fitted and the
connections are secure.
4
4 Check the condensate pipework is
correctly fitted and connected.
4 Check the condensate trap is filled with
water.
NOTE: The cabinet is not load bearing, it only
provides weather protection for the boiler
inside.
I
M
PORTANT: If the boiler is not to be
commissioned immediately then:
After successfully completing all of the
checks and any rectification work, close the
water valves, shut off the oil supply and
electrically isolate the boiler.
Complet
e t
he inst
allat
ion part of t
he
Guarant
ee Regist
ration Card, and complete
CD1
0 or its equivalent, to inform the LABC
of the installation.
1
2
2
3
4
PRE-COMMISSIONING
CHECKS - APPLIANCE
I
N
S
T
ALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL 12/18-18/25-25/32
8 716 112 700a (02.07)
29
COMMISSIONING