Instruction manual
FINISHING COMMISSIONING -
AP
PLIANCE
14 Refit the top panel and press down to
compress the seal when fitting the
securing screws (A).
24 Push the front panel (B) up behind the top
panel and push in at the base to secure
with the easy grip screws (C).
Handover:
4Complete the Guarantee Registration C
ard,
Combustion Record (page 47) and a CD11
or an equivalent commissioning form.
4Set up the controls and show the user how
to operate all the controls shown in the User
Guide and all system controls
.
4Where applicable, instruct the customer how
to repressurise the system.
4If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler.
NOTE: Release drain point (D) to drain the
secondary heat exchanger.
D
A
A
1
C
C
B
2
FINISHING COMMISSIONING -
APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL 12/18-18/25-25/32
8 7
16 112 7
00a (02.0
7)
36
COMMISSIONING