Instruction manual
INSPECTION AND SERVICE
External oil filter:
4Remove the paper element from the external
oil filter and replace it. If the filter contains a
washable element, thoroughly clean in
kerosene and reassemble into the filter.
Clean the boiler:
Manifold access:
4Remove top cover by releasing the
screws (A) at each corner and lift free.
4Release screws (B) to remove the flue manifold
access cover (C) and clear any debris.
4Check the condensate route (D) is clear and
clean the condensate trap and pipework.
4Check the flue system and clean if necessary.
4Remove the baffle retainer (E) and baffles (F)
from the secondary heat exchanger.
4Check and clean the secondary heat
exchanger surfaces.
NOTE: Do not use wire brushes and
cleaning agents to clean the stainless steel
secondary heat exchanger components.
4Pour 500ml of water into drain (G) to refill the
condens
ate trap.
4Clean the secondary heat exchanger baffles
(F) if necessary and refit correctly.
4 Refit the baffle retainer (E).
4Check the seal on the manifold access cover
(C) and replace if necessary.
4Refit the flue manifold access cover (C)
and secure with screws (B).
Combustion chamber:
4 Release the M10 retaining nuts and washers ( I )
and remove combustion chamber access door ( J ).
4Check the fibreglass rope seal on the
combustion chamber access door ( J ) and
replace if necessary.
4Remove the 2 screws (K) and baffle access
panel (L) located at the top of the primary heat
exchanger and remove the baffle retainers (M).
4 Remove the baffles (N) and restrictor plate/s
(O, not on 25/32 model), clean and check
the condition of the baffles and the restrictor
plate/s. Replace any parts considered to be
badly corroded/degraded
.
4Remove the acoustic insulation insert (P).
4Thoroughly clean all of the heat exchanger
surfaces using a suit
able brush and clear all
loose debris from the combustion chamber
and upper chamber.
4Check the condition of the combustion
chamber access door insulation. If the
insulation is damaged the door assembly
must be replaced
.
4Chec
k the condition of the baffle access
panel seal.
4Refit the acoustic insulation insert (
P).
4Refit the items in reverse order ensure the
baffles (N), baffle retainers (M) and restrictor
plate/s (O, not on 25/32 model) are correctly
fitted for the boiler output as shown in the
plan view opposite.
4Refit baffle access panel (
L).
4Refit combustion chamber access door (J).
4Secure with nuts and washers ( I ) and tighten until
the door is firmly secured using the sequence
shown opposite. Do not over tighten the nuts
.
Fire valve:
4Chec
k that the oil supply pipe has a fire valve
fitted ex
ternally to the building with the fire
valve sensor located within the
appliance case. A fire valve sensor clip (Q) is
provided for this purpose.
Plan sectional view
Plan sectional view
Plan sectional view
Combustion chamber
access door tightening
sequence.
IMPORTANT when refitting
the combustion chamber
access door (4)
12/18
18/25
25/32
500ml
INSPECTION AND SERVICE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL 12/18-18/25-25/32
8 7
16 112 7
00a (02.0
7)
39
SERVICING
& S
P
AR
E
S
A
B
G
C
E
D
F
Q
I
K
L
P
N
O
M
P
N
M
P
N
O
M
J