Instruction manual

WATER SYSTEMS & PIPEWORK
FILLING PRIMARY SEALED SYSTEMS:
Filling the system must comply with one of
the methods shown opposite.
The filling point must be at low level and must
never be a permanent direct fixing to the
mains water supply.
Filling loops must be WRAS approved.
INSTALLATIONCOMMISSIONING
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL &
EXTERNAL SYSTEM 12/18-18/25-25/32
8 716 115 667a (05.2009)
12
PRE -
INSTALLATION
WATER SYSTEMS & PIPEWORK