Instruction manual
PIPEWORK CONNECTIONS
A - Flow (External regular models only)
optional open vent/air vent 1” BSP on
12/18, 18/25 and (1
1
/
4
” BSP on 25/32
models).
A1 - Flow (External System models only)
22mm Ø copper (28mm Ø on
25/32 models)
B - Primary drain & optional feed and
expansion/feed
3
/
4
” BSP
C - Return 22mm Ø copper (28mm Ø on
25/32 models)
D - Fixing point for optional return oil line
E - Oil isolating valve (10mmØ)
F - Flexible oil hose
G - Pressure relief discharge pipe
15mm Ø copper (External System
models only)
WATER CONNECTIONS:
All service pipes into the property must pass
through the services duct.
Insulate all the system/supply pipes and
where the pipes pass through the duct use
at least 22mm insulation around the pipes.
Remove the transit bungs from the pipework
connections on the boiler.
NOTE: that surplus water may be present due
to factory testing.
Ensure all pipework is clean.
Fit the return pipe (C) to the secondary heat
exchanger using the sealing washer supplied.
Align water pipework through the 100mm Ø
duct and connect, ensuring that the
control box fits correctly before permanently
connecting the pipework.
Check that all unused sockets have been
capped.
OIL SUPPLY CONNECTIONS:
NOTE: Oil filters and de-aeration devices are
not to be fitted within the casing and the fire
valve body must be at least 1 metre from the
external casing.
Route the oil supply pipe through the
appropriate casing hole as required and
connect to the isolating valve (E) and ensure
the valve is closed.
Connect the flexible oil hose (F) to the isolating
valve (E).
Pass the fire valve sensor through the most
appropriate casing hole and locate the
capillary in the cut out at the bottom of the
hole.
Clip the sensor into the clip provided at the
rear of the control box.
Rotate the cover plate and seal so it does not
cover the capillary, then secure with the screws
provided.
CAUTION: ISOLATE THE OIL & WATER MAINS SUPPLY BEFORE STARTING ANY
WORK AND OBSERVE ALL RELEVANT SAFETY PRECAUTIONS.
A
External
regular
models
only
B
C (Return pipe)
located at the side
of the secondary
heat exchanger
D
E
F
Return pipe
(C)
Washer
PIPEWORK CONNECTIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL &
EXTERNAL SYSTEM 12/18-18/25-25/32
8 716 115 667a (05.2009)
25
INSTALLATION
A1 (Flow pipe)
External System
only (behind
boiler)
G External System
only Pressure
relief outlet
(behind boiler)
CAMRAY EXTERNAL SYSTEM SHOWN