PRE-COMMISSIONING
CHECKS - APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL &
EXTERNAL SYSTEM 12/18-18/25-25/32
8 716 115 667a (05.2009)
34
PRE-COMMISSIONING CHECKS -
APPLIANCE
CAUTION: ISOLATE THE MAINS SUPPLIES
BEFORE STARTING ANY WORK AND
OBSERVE ALL RELEVANT SAFETY
PRECAUTIONS.
Check that the service and water pipes are
connected correctly.
Check that all unused sockets are plugged.
1 Check that the oil supply is kerosene and
that the pipework is connected correctly to
the oil pump, via the supplied flexible hose.
Check that the burner is seated correctly
on its mounting flange and that the oil
hose/s are not trapped in front of or
underneath the burner.
Turn on the main oil supply valve at the
tank, check the oil supply pipework and
connections. Rectify any leaks.
Check the flue is correctly fitted and the
connections are secure.
2 Check the condensate pipework is
correctly fitted and connected.
Check the condensate trap is filled with
water.
NOTE: The cabinet is not load bearing, it only
provides weather protection for the boiler
inside.
IMPORTANT: If the boiler is not to be
commissioned immediately then:
After successfully completing all of the
checks and any rectification work, close the
water valves, shut off the oil supply and
electrically isolate the boiler.
Complete the installation part of the
Guarantee Registration Card and complete
CD10 or its equivalent, to inform the LABC
of the installation.
1
2
COMMISSIONING
CAMRAY EXTERNAL REGULAR SHOWN