Instruction manual

FINISHING COMMISSIONING -
APPLIANCE
1 Refit the top panel and press down to
compress the seal when fitting the
securing screws (A).
2 Push the front panel (B) up behind the top
panel and push in at the base to secure
with the screws (C) using the tool povided.
Always apply pressure at the edges of the
boiler panels when securing to avoid
accidental damage
Handover:
Complete the Guarantee Registration Card,
Combustion Record (page 47) and a CD11
or an equivalent commissioning form.
Set up the controls and show the user how
to operate all the controls shown in the User
Guide and all system controls.
Where applicable, instruct the customer how
to repressurise the system.
If the appliance is unused and exposed to
freezing conditions, shut off all the mains
supplies and drain the system and boiler.
The drain points are normally on the lowest
points of the system.
NOTE: Release drain point (D) to drain the
secondary heat exchanger.
D
A
A
1
C
C
B
2
31
FINISHING COMMISSIONING -
APPLIANCE
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR CAMRAY EXTERNAL &
EXTERNAL SYSTEM 12/18-18/25-25/32
8 716 115 667a (05.2009)
41
COMMISSIONING
CAMRAY EXTERNAL REGULAR SHOWN