Technical data

17
Siting of the indoor unit
Rooms where the Greenstar Plus Hybrid Manager or
the refrigerant lines are installed must have an internal
volume of at least 5.7m
3
, if the room is to be occupied.
Ensure minimum clearances are maintained
Mount the Greenstar Plus Hybrid Manager on to a fixed
rigid wall capable of supporting the weight of the unit
To reduce the installation effort we recommend the
installation of the Greenstar Plus Hybrid Manager below
the boiler
Flow and return pipes can be routed vertically from the
top or bottom into the Greenstar Plus Hybrid Manager
Refrigerant lines can be routed vertically from the top into
the Greenstar Plus Hybrid Manager
If refrigerant lines are to be routed downwards, allow for
adequate space to route the pipes downwards alongside
the unit, preferably on the left hand side.
Indoor unit casing dimensions and pipework connections
Greenstar Plus Hybrid Manager indoor unit dimensions
360mm
32mm
363mm
95mm
30mm
53mm
500mm
85mm
22mm
448mm
390mm
Pipe dimensions
Flow/return, heating system and additional heat 22mm
Refrigerant pipe gas/liquid, to external unit ½" and ¼"
Installation clearances – Greenstar Plus Hybrid Manager
indoor unit
Top:
250mm
Bottom:
200mm
Side:
5mm
Side:
5mm
Front:
800mm for
maintenance
Top:
250mm
Bottom:
200mm
Side:
5mm
Side:
5mm
Front:
800mm for
maintenance