Technical data
16
 Important: bathroom locations and clearances
•
 The boiler must not be installed in Zone 1
•
 Any switch or appliance control using mains electricity 
must not be within reach of a person using the bath 
or shower
•
 Electrical switches (other than pull cords), fused spurs 
and socket outlets must not be situated in the bathroom
•
 A boiler fitted with a mechanical timer or RF mechanical 
timer (receiver) or FW100 controller may only be installed 
outside the shaded area. A boiler with any other timer 
fitted (or blanking panel for an optional programmer) can 
be installed in zone 2.
•
 Additional Residual Current Device (RCD) protection may 
be required.
Refer to the latest IEE wiring regulations.
2*
Radius 600mm
Radius
600mm
2
1
2
2
2
1
2
2
2
1
600mm
600mm
600mm
750mm
2,250mm
2,250mm
2*
*Without the end wall, zone 2 must extend 600mm from the bath. 
Radius 600mm
Radius
600mm
2
1
2
2
2
1
2
2
600mm
2
1
2
600mm
600mm
600mm
750mm
2250mm
2250mm
Site preparation/portability
Greenstar Highflow CDi appliances are supplied with a 
floor mounted pre-plumbing jig. The jig enables all gas and 
water services to be pre-plumbed and tested prior to fitting 
the boiler.
For ease of installation the appliance has a roll-in boiler tray 
which allows it to be rolled into place once the connections 
have been made.
Casing dimensions
850mm
600mm†
600mm
†630mm to front of flap.
Pipework connections
A
B
C
D
E
Pipework connections
A Central heating flow  22mm
B DHW flow 22mm
C Gas inlet 22mm
D Cold main inlet 22mm
E Central heating return  22mm