Technical data

PRE-INSTALLATION
6 720 648 547 (2012/06) 15
3.6 PLUMBING MANIFOLD
CONNECTIONS:
Heating System: 22 mm compression fittings
Gas: 22 mm compression fittings
Use the fittings supplied in the Hardware pack.
PREPLUMBING
With the plumbing manifold installed, pipe work can be installed to the
valves on the manifold.
RUNNING PIPES BEHIND THE BOILER
If the boiler pipes are to be run behind the appliance ensure that the
pipes pass close to the wall as shown in the diagram opposite, and within
the pipe guide.
Fig. 18 Behind the boiler pipe run
Fig. 19 Below the boiler pipe run
Return 22mm
Flow 22mm
Mains Gas Supply 22mm
6720648547-05.1Wo
Mains
Gas Supply
22mm
Flow
22mm
Return
22mm
6720648547-06.1Wo