Technical data
6 720 611 445 GB (04.05)
14
Installation
3.4 Wall mounting frame assembly
B Take the wall mounting frame out of the package and
screw together with 6 screws as shown in fig. 8. Use
the inner lugs on the top and bottom horizontal sec-
tions.
Fig. 8
B Hold the wall-mounting frame against the wall ensur-
ing that it is vertical.
B Mark the holes for the wall mounting frame onto the
wall, drill and plug the holes and screw the wall
mounting frame to the wall with the screws provided.
B Mark the position of the flue duct hole if a rear flue is
to be used. Refer to fig. 1 and 17.
Fig. 9
B Screw the pre-plumbing manifold with two screws to
the wall mounting frame.
Fig. 10
3.5 Pre-piping the system
Fig. 11 Manifold
43 Boiler flow
47 Boiler return
112 Gas cock
171 Not used
172 Not used
B Remove valves 171 and 172 from manifold, see Fig.
11.
B A drain tap should be fitted at the lowest point of the
central heating system.
6 720 610 576-04.1O
6 720 610 576-05.1O
6 720 610 576-11.1O
200
260
6 720 610 576-06.1O
35
120-130
50
4743
172112
171