User's Manual

Wisen Innovation Technical Doc. No.2019 WISENMESHNET® L-Series Omni Tilt Sensor Node - User Manual
www.wisencn.com Page - 10 - of 13
the figure below to make the DC power connections to “DC_IN” and “GND” terminal plugs.
Warning: incorrect power connection will cause serious damage.
Figure 6. DC Cable & RS232 Connections.
LED flashing sequence: You should see three Mesh LEDs flashing 3 times, then green LED on for 1s, then a quick
flash on the 3 LEDs, then Off. If not, power off the gateway, and leave it fully discharged for 180s before the next
powering-on.
6) Gateway should have its antennas point upwards.
7) 2G/3G/4G Signal Check: Providing the local 2G/3G/4G signal is good for connection and the correct APN setting of
the corresponding SIM mobile service operator is configured in the gateway, it takes about 30-40s to connect to a
server. Once the gateway is connected to the server, the NET LED will be on.
8) Tighten the 4 Cap-Hex-Head screws on Gateway lid.
9) To validate the gateway data, please visit WISENMESHNET
®
Visualisation Platform for further details.
5.3Mounting Options
Gateway can be deployed with various methods. However, the priciple is to make sure it is firmly attached to the
installation surface.
Notice :
1) When the deployment is complete, please ensure that power is turned on and the cable glands are tightened. Any
unused gland should be sealed properly to maintain the IP rating of the box;
2) Ensure that data is seen from the remote server.
6. General Maintenance and Notification
1) Once the WISENMESHNET
®
Smart Gateway is installed and working, please do not interfere with it unless it is
absolutely necessary;